Homepage | Set Home | Add to Favorites
Member

Hold International Group Co., Ltd


Products
  • No Category
Search
 

Friends links
  • No link

Hot Gas Bypass
Click image to view full size image
Product: Views:167Hot Gas Bypass 
Unit price: Negotiable
MOQ:
Quantity:
Delivery date: Since the payment date Days delivery
Valid until: Long-term effective
Last updated: 2017-12-25 17:25
  Inquiry
Details
Model Number: PTV series-#3104 Brand Name: FENSHEN Key Specifications/Special Features: Constant pressure expansion valvesExpansion valves got gas bypass PTV8 can adjust compressor capacity and make it match with the load of evaporatorPlaced in bypass between high and low pressure side of refrigeration system, imposes lower limit on compressor suction pressure by supplying the low pressure side with replacement capacity in the form of hot or cool gas from high pressure sideFeatures:Exquisite angle design for easy installationAccurate adjusting pressure
  • Wide capacity and operating ranges
  • Technical data:
    • Maximum working pressure: 2.5MPa
    • Maximum testing pressure: 3MPa
  • Pressure expansion valves model Normal capacity (kW) Connection (in) Adjusting range (MPa) Medium temperature (°C) Maximum working pressure (MPa) Maximum testing pressure (MPa)
    R134a R22/R407C R404A/R507 R410A Inlet Outlet
    PTV8 7 11 7 3/8SAE 1/2SAE 0.03-0.6 -25-100 2.5 3
    PTV8W 7 11 7 3/8ODF 1/2ODF
    PTV10W 14 22.5 16.2 1/2ODF 5/8ODF
    PTV12W 30 40 25 1/2ODF 5/8ODF
    PTV8W-PL 12.5 3/8ODF 1/2ODF 0.5-1.0 4.2 4.5
    PTV10W-PL 12.5 1/2ODF 5/8ODF
    Shipping Information:
    • FOB Port: Shanghai
    • Lead Time: 5 - 7 days
    Main Export Markets:
    • Asia
    • Australasia
    • Central/South America
    • Mid East/Africa
    • North America
    • Western Europe

    Download more information about this product

    Inquiry